Peabody Museum & KGL Project 5-5-21
Peabody Museum_KGL_Project.pdf
Peabody Museum & KGL Code Upgrade Town Hall
https://yale.app.box.com/s/ygldu2ihbx79ihem60lmhnfszw9xcw8v
Peabody Museum & KGL Code Upgrade Town Hall 2-18-21
https://yale.box.com/s/bmiu6xl9v5ztqogqig7gvnynyb08yup7
SHUTDOWN LIST
ESC Connecting Bridge to KGL at the second floor will be closed for construction work commencing 12-22-20.
It is estimated to be closed for approximately 8 months.
BUILDING RENOVATIONS
1st Floor Mens Room 118 Shutdown User Notice 1-18-21
Stair No. 4 Abatement 12-18-20
Stair No. 5 Abatement 12-18-20
Second Floor West Corridor Abatement 12-7-20
Second Floor East Corridor Abatement 12-7-20
Third Floor Corridor Abatement 12-7-20
Stair #2 All Floors User Abatement 12-2-20
First Floor Abatement 11-04-2020
First Floor Ceiling Removal 11-03-20
Second Floor Ceiling Removal 11-04-20
Third Floor Corridor Ceiling Removal 11-06-20
Third Floor Corridor 390 Abatement Phasing User Notice 11-19-20
Third Floor Corridor 392 Abatement Phasing User Notice 11-19-20
Stair #1 All Floors Abatement Phasing User Notice 11-19-20
Elevator Abatement of Flooring at Elevator Phasing User Notice 11-18-20
Lobby Ceiling Access Holes 11-06-20
Town Hall Notes 08-06-20